Tung Chung New Town Extension – Reclamation and Advance Works
Contractor’s Design responsible for the proposed Pak Mong Pier, temporary pontoon, and the future breakwater at the Marina, instrumentation and monitoring, Responsible for Marine Traffic and modification of the Tung Chung Buoyed Channel. The detailed design of all geotechnical instruments during the reclamation works, the Design of temporary onshore structures, breakwaters, pontoons, value engineering for permanent breakwaters, geotechnical works, Ground Improvement (DCM, Band Drains, Surcharge, Dewatering), Seawall (Temporary and Permanent), Reclamation, Structural, Excavation and Lateral Support, DCM Trial Area.