Temporary Quarantine Facilities at Penny’s Bay
Meinhardt provided Preliminary Design, Detailed Design and Construction Drawings services.
Meinhardt provided Preliminary Design, Detailed Design and Construction Drawings services.
Meinhardt provided Preliminary Design, Detailed Design and Construction Drawings services.
Project C is located at vacant site of TKOIE abutting Chun Kwong Street, Chun Cheong Street and Chun Yat Street with a site area of about 27,145m².
The Hong Kong Science Park Phase 2 covers approx 20,000m² site area and 105,000m² GFA that composing 10 numbers 7-storey buildings including energy towers,
5 nos. of 23 to 25-storeys high residential block with staggering wings with a total of 2,805 units. Other facilities include social welfare facilities (Neighbourhood Elderly Centre and Integrated Children & Youth Services Centre), a 7-classroom kindergarten and associated external works.
It is a major urban redevelopment project in Kwun Tong comprising of four nos. of 40+ storeys residential building and a podium of retail, Public Transport Interchange, Hawker Bazaar, Refuse Collection Point and basement carpark.
This project is located in Dongguan,Guangdong. The total construction area is 594,265.73m², of which 2 plots (OPPO University) have a construction area of 63,073.22m²,
Mixed development with GFA of 106,892m² office building, 105,588m² shopping mall, 30,000m² hotel, 27,500m² above ground carpark and 23,436m² basement carpark. 2) GIC facilities with GFA of 40,000m² above ground carpark, 151,698m² basement carpark, 140,991m² public transport interchange and 50,000m² public GIC offices.
The existing Hennessy Centre, which comprises a 40-storey and 16-storey towers, including a 5-floor podium and a 3-floor basement is demolished.
The project is located on Z-2a plot which is beside the 3rd ring road. Total GFA is 132,471m²(with 90,000m²above the ground and 42,471m²underground). There are 44 floors above the ground and five levels underground. The tower building has a height of 205m.